(404) 987-6225 Quote

Straddle Carrier & Port Equipment Transport

Nationwide transport of straddle carriers, rubber-tired gantry cranes, reach stackers, and heavy container handling equipment. Specialized heavy-lift coordination, oversize permits, and pilot car services — R&RM LLC since 2011.

Get a Transport Quote (404) 987-6225

Straddle Carrier & Port Equipment Hauling Services

Straddle carriers, rubber-tired gantry (RTG) cranes, reach stackers, and empty container handlers are among the most dimensionally challenging pieces of equipment in the intermodal and port logistics industry. These machines are designed for movement within confined terminal environments, not over public roads — which means that every over-road transport move requires specialized handling, partial disassembly in many cases, and careful coordination between heavy-lift rigging crews, oversize permit offices, and experienced transport providers. R&RM LLC has been moving industrial equipment and oversize loads across all 48 continental states since 2011. We understand the complexity of port and intermodal equipment transport and manage the full logistics chain from first pickup to final delivery.

Whether you are relocating a straddle carrier between terminals, shipping a reach stacker from a port to an inland intermodal facility, or transporting a rubber-tired gantry to a new rail yard, our team has the experience to plan the move correctly, procure the right permits, and deliver on time.

Equipment Types We Transport

Straddle Carriers

Straddle carriers are self-propelled portal machines that straddle one or more rows of containers or other cargo, lifting and transporting them on a wheeled frame. They are common in seaport container terminals, rail intermodal yards, and large distribution facilities. Transport dimensions and weights vary significantly by model and generation:

A fully assembled straddle carrier typically cannot move over public roads. The portal frame structure — designed to straddle a 40-foot container — is wider than any legal highway dimension. Most straddle carrier transports require partial disassembly: the portal legs and crossbeam are separated and loaded individually, then reassembled at the destination. This requires a rigging crew, a crane or jacking system at both origin and destination, and coordination with the terminal's maintenance staff who understands the specific disassembly sequence for that unit.

Rubber-Tired Gantry (RTG) Cranes

Rubber-tired gantry cranes are rail-free container stacking cranes mounted on rubber-tired bogies that allow them to move within a container yard. They are larger than straddle carriers and cannot move over public roads in assembled form under any US permit category — full disassembly into major structural components is required. Transport of an RTG typically involves:

RTG disassembly and transport is a full project management exercise. We work with terminal engineering staff and rigging contractors to develop a component transport plan that sequences the loads to arrive in the right order for reassembly, minimizing crane and rigging crew idle time at the destination. See our permit services page for more on superload permitting for heavy girder transports.

Reach Stackers

Reach stackers are perhaps the most commonly transported piece of port and intermodal equipment, because they are regularly moved between facilities as shipping volumes shift. A reach stacker is a wheeled, telescopic boom container handler capable of lifting and stacking containers up to five high. Compared to straddle carriers and RTGs, reach stackers are simpler to transport — most models can be transported in a folded configuration as a single legal or near-legal oversize load:

Reach stackers are most commonly transported on RGN (removable gooseneck) trailers for drive-on loading with the machine's own power or on multi-axle lowboys for heavier units. We confirm transport configuration dimensions with the owner's manual or dealer before quoting to ensure the permit package accurately reflects the actual load dimensions.

Empty Container Handlers

Empty container handlers — also called ECHs or empty handlers — are smaller, lighter machines designed to lift and stack empty containers in a depot or terminal. Units from Kalmar, Linde, and Hyster are common at empty container depots adjacent to major ports. These machines are lighter than reach stackers (typically 55,000–75,000 lbs) but still require oversize permits for width and sometimes height. Drive-on RGN loading is standard for most models.

Transport Dimensions & Permit Requirements

Port and intermodal equipment spans a wide range of transport dimensions depending on whether the machine moves as a single assembled unit, partially disassembled, or fully broken down into components. Typical ranges:

These dimensions require oversize permits in all 48 states and in many cases trigger escort pilot car requirements. RTG girder transports are classified as superloads in most states and require engineering review, bridge analysis, and advance notice periods of 5–10 business days or more before the move can depart. We handle permit procurement through our established relationships with permit services offices in all 48 states and can advise on realistic lead times for each state on the route.

Trailer Selection for Port Equipment Transport

Trailer selection for straddle carrier and port equipment transport depends on the machine type and whether it moves assembled or disassembled:

Pickup & Delivery Scenarios

Terminal-to-Terminal Relocations

The most common port equipment transport scenario is relocation of reach stackers or empty handlers between container terminals as operating conditions shift — a port with excess capacity in one terminal transfers equipment to a busier terminal, or a chassis leasing company repositions units between facilities. These moves are typically time-sensitive: the destination terminal needs the machine operational before a vessel call or during peak container import season.

We coordinate with terminal operations staff at both origin and destination to understand gate access restrictions, overhead clearance in terminal areas, and any ground-bearing restrictions that affect where loaded trailers can park while awaiting off-load. Ports often have strict commercial vehicle access rules, and familiarity with these procedures prevents delays at the gate.

Port-to-Inland Intermodal Ramp Moves

Inland intermodal ramps operated by Class I railroads (BNSF, UP, NS, CSX) are increasingly significant for container logistics, and reach stackers are regularly transported from seaports to these inland ramps as capacity expands. These moves often cross multiple states, requiring a multi-state permit package and careful routing to avoid low clearance bridges on corridors that connect coastal ports to inland rail yards.

Auction and Dealer Shipments

Used reach stackers and container handlers appear regularly at Ritchie Bros., IronPlanet, and specialized port equipment auctions. Buyers at these auctions need fast transport to put the machine into service before the season window or to avoid extended storage charges at the auction site. We provide fast turnaround on permits and dispatch for auction buyer shipments, with permit procurement beginning as soon as we have confirmed dimensions and weights from the buyer.

New Equipment Deliveries from Ports of Entry

New port equipment manufactured in Europe (Kalmar, Konecranes, Liebherr) arrives at US ports of entry partially assembled or in components. These deliveries from arrival port to operating terminal often require permits for oversized component loads and careful coordination with the terminal's rigging contractor for final assembly. We work with ports of entry in Savannah, Baltimore, Houston, Los Angeles, and other gateway ports to handle these new equipment deliveries.

Coordination with Rigging & Heavy-Lift Contractors

Many port equipment transports — particularly straddle carriers and RTG cranes — require crane or jacking services at both pickup and delivery to disassemble and reassemble the machine. The heavy-lift rigging phase is separate from the over-road transport phase, and coordinating the two to minimize combined project cost and downtime requires planning. We regularly work alongside rigging contractors on port equipment projects and can coordinate scheduling so that the transport arrives when the rigging crew is ready — not days before or after.

For reach stackers and empty handlers that drive onto RGN trailers under their own power, rigging coordination is typically not needed. For straddle carriers and RTGs, we provide a transport plan to the rigging contractor in advance so they know the number of loads, the sequence of component transports, the arrival schedule, and any special handling requirements for each piece.

Service Area

R&RM LLC transports port and intermodal equipment across all 48 continental states from our base in Cumming, Georgia. High-volume corridors for port equipment transport include the Southeast coast (Georgia, South Carolina, Virginia), Gulf Coast (Texas, Louisiana), Mid-Atlantic (Maryland, New Jersey, New York), and West Coast connections (Arizona, Utah, Colorado) to inland intermodal points. We serve Georgia, Texas, South Carolina, Virginia, and all other continental US states.

Get a Port Equipment Transport Quote

To quote a straddle carrier, reach stacker, RTG, or container handler transport, provide: equipment make, model, and type; whether the machine will move assembled or disassembled; transport dimensions (width, height, length in transport or disassembled configuration); transport weight; pickup location (terminal, port, or facility name and city/state); delivery location; and required delivery window. Call us at (404) 987-6225 or use the form below.

Request a Quote Contact Us

Port Equipment Transport Specialists

RGN loading, superload permits, heavy-lift coordination — R&RM LLC moves reach stackers, RTG cranes, and straddle carriers nationwide since 2011.

Get a Quote